Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

  • Type: Journal Article
  • Keywords: Engineer-to-order; Design process; Last planner system; Planning and control; Design teams; Prefabricated building systems;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2016-0045
  • Abstract:
    The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments. Design/methodology/approach Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams. Findings The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices. Research limitations/implications Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested. Originality/value The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.